Poland
Zalesie Wind Farm is located in Mazury Village Warmian-Masurian Voivodeship, in northern Poland.
Building permit and Grid connection for 24.85 MW granted in 2018.
Wind speeds of over 6.65 m/s at 101 m.
High-voltage electric substation 110/30 kV is constructed, and 110 kV power transmission cables are laid.
All seven wind turbines were installed in March 2023.
In September 2023, Zalesie Wind Farm, with a capacity of almost 25 MW, was purchased upon receiving a generation license.
Key data:
- Manufacturer: Siemens Gamesa
- Number of turbines: 7
- Turbine type: SG132 - 3.55 MW
- Rotor diameter: 132 m
- Total power of the park: 25 MW
- Commissioning of the park: August 2023